兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

久久97久久97精品免视看| 无码中文字幕乱在线观看| 亚洲变态另类天堂AV手机版| 青草青在线视频在线观看| 国产亚洲日韩AV在线播放不卡| 99精品久久精品一区二区| 免费午夜无码18禁无码影视| 国产无av码在线观看| 好爽…又高潮了免费毛片| 青青草AV一区二区三区| 亚洲VA欧美VA国产VA综合| 欧美人与动牲交ZOOZ乌克兰| 无码人妻精品一区二区蜜桃网站| 成人午夜精品无码一区二区三区| 欧美A级V片在线观看| 久热综合在线亚洲精品| 亚洲国产美女精品久久久久| 熟妇人妻系列aⅴ无码专区友真希| 中文字幕乱码免费视频| 成人免费一区二区三区视频| 亚洲人成国产精品无码果冻| yw尤物爆乳网站点击进入| 午夜毛片精彩毛片| 插我一区二区在线观看| 精品人妻久久久久久888| 亚洲中文无码AV永不收费| 影音先锋人妻啪啪AV资源网站| 老熟女高潮一区二区三区| 欧美又大又硬又长又粗A片免费看| 日产亚洲一区二区三区| 无码人妻一区二区三区av| 免费久久99精品国产自在现| 中文字幕人妻丝袜美腿乱| 欧美性开放情侣网站| 人妻巨大乳hd免费看| 国产日产欧产精品精品软件| 双腿张开被9个黑人调教影片| 西西人体扒开下部试看120秒| 亚洲AV福利天堂在线观看| 色婷婷久久啪啪一区二区| 亚洲乱码日产精品一二三|