兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

精品国产日韩亚洲一区| 色老板精品视频在线观看| 人妻系列无码专区AV在线| 亚洲av无码一区二区三区在线| 色偷偷亚洲女人的天堂| 护士张开腿被奷日出白浆| 在线观看免费无码专区| 久久99精品国产99久久6尤物| 亚洲熟妇自偷自拍另欧美| 女人被狂躁到高潮视频免费软件| 精品久久久久久中文字幕| 成人午夜大片免费看爽爽爽| 亚洲无线码高清在线观看| 日本亲与子乱人妻HD| 亚洲无线观看国产精品| 亚洲成年电人电影| 国产亚洲情侣一区二区无码AV| 国产无套粉嫩白浆在线观看| 国产一区精选播放022| 999精产国品一二三产区区别| 在线看AV一区二区三区| 色悠久久久久久久综合网伊人| 亚洲国产精品无码成人片久久| 亚洲午夜无码久久久久蜜臀av| 内射精品无码中文字幕| 精品午夜福利在线视在亚洲| 亚洲偷自拍国综合| 国语对白熟女 硬了| 夜鲁鲁鲁夜夜综合视频| 人禽杂交18禁网站免费| 国产午夜激无码AV毛片| 亚洲国产成人久久综合一区| 国产精品 亚洲一区二区三区| 亚洲AV永久无码精品无码| 久久久久无码精品亚洲日韩| AI人脸替换忘忧草1区2区| 老色鬼在线精品视频在线观看| 国产精品视频二区不卡| 亚洲欧美成人久久一区| 婷婷亚洲久悠悠色悠在线播放| 国产精品美女久久久网av|