兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
国产乱子伦视频在线播放| 啊轻点内射在线视频| 99视频精品全部在线观看| 青青久久久久精品亚洲AV中文| 亚洲成AV人片在线观看麦芽| 久久国产乱子伦精品免费午夜| 久久6久久66热这里只是精品| 黑人粗长大战亚洲女| 亚洲日韩欧美一区二区三区| 六月丁香婷婷色狠狠久久| 99精品视频69V精品视频| 欧美成人精品高清在线观看| 好吊妞国产欧美日韩免费观看| 国产99久9在线传媒的用户体验| 久久综合五月丁香六月丁香| 国内精品久久久久伊人AV| 亚洲国产精品无码久久久蜜芽| 婷婷成人丁香五月综合激情| 少妇久久久久久久久久| 国产在线乱码一区二区三区| 午夜福利理论片高清在线观看| 日韩精品人妻2022无码中文字幕| 国产香蕉尹人在线观看视频| 国语自产拍精品香蕉在线播放| 99精产国品一二三产区NBA| 欧美日韩精品一区二区三区不卡| 中文字幕在线亚洲日韩6页| 欧美又大粗又爽又黄大片视频| 无码乱码天天更新| 国内A级毛片免费观看| 亚洲国产成人久久精品软件| 国产av影片麻豆精品传媒| 免费无码又爽又刺激激情视频| 国产乱码精品一区二区三区四川人| 亚洲午夜成人精品电影在线观看| 免费又爽又黄禁片视频1000| 亚洲日韩欧美一区二区三区| 国产免费人成在线视频| 国产成人亚洲精品无码车A| 芒果乱码一线二线三线新区| 久久国产精品免费一区下载|